painted the two north/south end boards for the roof rafters, and the two milled pieces for the top of the glass.
painted the milled pieces for the bottom of the glass/top of the plywood
dropped the nearly empty paint can and spilled some paint
painted the horizontal milled pieces for the bottom of the glass/top of the plywood
painted the vertical posts on their sides next to where the glass will be installed so i dont have to paint them when the glass is there.
close up of the milled pieces for the bottom of the glass
cut some backer boards for the inside of plywood seams
seam
two backer boards (not yet installed), cut to fit the seams of plywood that hasnt yet been cut
No comments:
Post a Comment