brackets were used to attach the roof rafters. this is the south wall
north wall
the metal corners on the northwest corner of the roof
the bent over metal overhang along the north edge of the roof
the northwest corner of the roof, looking up from below
the northeast corner of the roof
the roof rafters are now painted
everything in the greenhouse is now fully painted with primer. i am done with the primer! it took two gallons of primer. theres about an inch or so left in this second can.
caulking on the top of glass. it is really hard to get pictures of the caulk in focus.
caulking bottom of south window. its not easy to master caulking either. towards the right end of the photo you can see i somehow got an air bubble in there.
caulking between the glass on the bottom of the south wall
we could have turned this post to avoid having to fill this hole with caulk
this post the hole went all the way thru, so it'd have been on one window or the other even if turned
shims were cut and glued into place on the upper south windows. (held in place with tape until the glue dried))
caulking, upper south glass
the greenhouse as it currently stands, north wall
south (east) wall
southwest corner. some planks on the red fence were removed. maybe some day in the future i'll move the fence post to the left. but for now i like the red fence where it is and dont want to take it down. so it stands as is. theres ALWAYS more projects...
like removing oil based paint from the glass (oops)
at this point the roof eaves are still open and needing to be closed up. south wall
north wall open eaves
No comments:
Post a Comment