Wednesday, October 24, 2018

knocked out a bunch more cabinets

woke up SO sore this morning. hands, wrists, arms, shoulders. muscles not used to being used.

today I put together the 4 drawers for the second base cabinet (assembled yesterday).

I put together 3 out of 4 drawers for the third base cabinet. the 4th drawer is waiting on its drawer-front to arrive before I assemble that one. (one drawer-front and one cabinet door had to be shipped out/weren't in stock.) then I put together that base cabinet. so the three base cabinets and 11 out of 12 drawers are assembled and ready to install.

then I assembled two of the upper cabinets. (one with the missing door). and matched their shelves up.

there are still three upper cabinets left to assemble.

I need to start taking down the old cabinets. its gonna get messy so I keep putting it off. but the new stuff cant go in til the old stuff is gone.

dad suggested we get the second half of the kitchen delivered. we'll go in next week and finish the order.

making space for the drawers
12

four drawers here for the second base cabinet
13

see? four.
14

the skinny 18" drawer and drawer front boxes. gotta make sure you get the part numbers right. there are a lot of boxes the same size with different numbers.
15

third base cabinet assembled
16

three out of the four drawers for that third cabinet (fourth one is missing its drawer front)
17

two of the upper cabinets and their door and shelves (one missing door)
18

No comments:

Post a Comment